Hammarby Sjöstad regenera­tion

Hammarby Sjöstad regenera­tion

Hammarby Sjöstad is an international exemplar for sustainable development and one of Stockholm’s largest urban regeneration projects. In the early 1990’s, there was nothing here except for dwindling industry on the heavily contaminated harbourside. Thirteen years in the making, this booming 200 hectare district is now home to 28,000 residents and 10,000 workers.

Circular economy in action

Instead of a traditional linear urban metabolism that consumes resources and discards waste, the Hammarby Model is a cyclical system that optimises the use of resources and minimises waste. The model unifies goals in land-use, transportation, building design, energy, water and waste that allowed the scheme to achieve a 50% reduction in energy consumption and carbon emissions, compared to the Swedish average for new builds.

Client: Wihlborgs, City of Stockholm, ByggVesta Bo, NCC Boende, Stockholmshem, White Arkitekter AB
Location: Stockholm, Sweden
Status: Completed 2013
Area: 250 hectare
Environmental certifications: 
Photographer: Åke E:son Lindman, Thomas Zaar

Hammarby Sjöstad is not an ‘eco-village’. It is a blueprint for designing and planning everyday healthy, resilient cities – for people and investment.
Economic crises, population growth, climate change, resource depletion, and an emerging obesity epidemic are all changing the conditions for human development. Can the way we plan and design our cities help to solve these challenges? We think so.
Monica von Schmalensee, Architect

The link between sustainability and lifestyle is embedded within every aspect of the project; a common objective that binds the community together. A large part of Hammarby Sjöstad’s success is Sweden’s general political commitment to social equality, environmentalism, and a consensual approach to issues such as planning and transport provision at a local level. The land was mostly city-owned, which allowed for relatively easy integration of public transport, power and water during the planning stage. Client and design teams stood in solidarity with private sector developers and contractors, who all pledged to uphold the overall quality aspirations.

Closing the energy, waste and water loops

In addition to compact buildings, high insulation standards and contributions from solar power, a key environmental strategy is the centralised production of district heating and cooling. Heat is extracted from treated wastewater in the Hammarby plant by heat pumps; the side-effects of this process then feed into the district cooling network Heating water is delivered to all the buildings in the same way as gas, electricity or domestic water, creating an extremely energy efficient basic solution. Much of the domestic waste is used for the generation of energy. A three-tube recycling system for organic, combustible and paper waste is located outside the entrance to each building; rubbish proceeds to be sucked out by vacuum to a centralised recycling depot.

It was crucial for Hammarby Sjöstad to not only be a place where people wanted to stay, but a place that got people moving and socialising, while decreasing the dependency on cars and connecting residents to nature. While site densities have been concentrated, every element of open space has been designed around people. All apartments have balconies, all buildings have lifts, streets are wide and landscaped, with semi-private areas that contain ample green space for bringing up families and mingling with neighbours.  Commercial and retail units are present at the ground floor of many apartment blocks, as mixed-use buildings make for vibrant, mixed communities. Transportation is a heavy burden on dense city districts, but the integrated planning of light rail, a free ferry and carpool initiative has ensured that almost 80% of journeys are by public transport, foot or bicycle.

An avenue links Hammarby Sjöstad’s new public green spaces throughout the south of the district, forming offshoots of green corridors in its passage. The parks south of the lake are all linked to Nacka Nature Reserve and Årsta forest to form green wedges into the heart of the plan, while planted viaducts stretch over the Södra Länken highway. New parks in the north connect with the parks of Vitaberg and Stora Blecktornet, offering all residents unfettered access into nature.

White adopted a prominent role in the making of Hammarby Sjöstad since the beginning. From participation in the planning process, key contributions came in the form of masterplanning ten neighbourhoods, designing award-winning mixed-use buildings in the Holmen and Lugnvattnet neighbourhoods, as well as providing environmental design coordination for Sickla Udde’s Farvattnet quarter, Forsen in Hammarby Gård, Snickeriet in Sjöstadsporten, and the northern community of Persikan. In collaboration with the city council, White also produced the materials guidelines for the overall environmental programme. Much of White’s leading position in environmental and sustainability issues stem from the research, experimentation and innovation that was allowed through the Hammarby Sjöstad commissions.

Contact & Team

Mats Egelius

Architect

Kjell Torstensson

Architect

Please share!

Related projects

All Projects

Loading...